FAT Service
Factory Acceptance Testing, witnessed on site.
A second pair of eyes at your factory gate. We attend the pre-delivery test, log what passes and what does not, and hand you a report you can hold a supplier to.
01What this is
An acceptance test happens whether you attend or not
Every display is tested before it is packed. The question is who signs the result. When nobody from the buyer’s side is in the room, the only account of the test is the supplier’s own — and it is written after the fact, by the party with an interest in it passing.
We stand in that room on your behalf. The panel is checked against the order, the test data is recorded as it is produced rather than reconstructed later, and the findings are written down the same day.
Nothing here is an opinion about quality. It is a record of what was measured, who was present, and what was agreed about the items that did not pass.
02Four checkpoints, counted backwards from the test
The schedule is fixed before we travel. Nothing in it is improvised on the day.
Prepare the ground
- Confirm the detailed order and product information
- Prepare the test forms and the test tools
- Confirm with the factory which engineer attends, and in what test environment
Agree the process
- Agree arrival times with the customer and the factory
- Brief the customer on what to expect and what to prepare
- Confirm the factory’s state of preparation against our requirements
- Explain the test sequence to everyone who will be in the room
Inspect on site
- Record the data obtained at every step
- Record how the other parties behave during the inspection
- Record the professionalism shown in problem solving
- Propose solutions and fix the correction cycle
Write the report
- Summarise the inspection to the customer without delay
- Revisit the rectification plan with the customer
- Confirm the improvement method and the re-inspection date
- Issue the report